Beginning of construction — today: picture slider FAIR

An interactive picture slider provides new insights and shows the progress on the FAIR construction site. It allows to compare the pictures from the beginning of construction and today.

The ring accelerator SIS100 and the transfer building

Photo: GSI/FAIR/L. Möller, zeitrausch.net 2020 Photo: GSI/FAIR/L. Möller, zeitrausch.net
2018

Experiment cave for CBM

Photo: GSI/FAIR/L. Möller, zeitrausch.net 2020 Photo: GSI/FAIR/L. Möller, zeitrausch.net
2018

Underground tunnel for SIS100 ring accelerator

Photo: GSI/FAIR/L. Möller, zeitrausch.net 2020 Photo: GSI/FAIR/L. Möller, zeitrausch.net
2018

Loading...