expected, the handling will be performed by a robot. 16.04.2021 Final Design Report of the target chamber finished The Final Design Report of the target chamber was successfully concluded by KVI-Center for Advanced [...] start under the supervision of GSI. 16.04.2021 Preliminary Design Report of the shielding flask approved The preliminary design report of the transport shielding flask was approved. The company Bilfinger [...] high of 4,3 meters and a weight of 60 tons. 16.10.2020 Final Design Report for lateral iron shielding in target area The Final Design Report for the production of lateral iron shielding in target area is accepted